Josh DargieInfrastructure · Cloud · Software

Blog / networking

Five red flags in a network cabling quote

How I read network cabling quotes: the five omissions that predict change orders, poor workmanship, and gear you can't maintain later.

I have read a lot of cabling quotes over the past twenty years, first as the person hiring contractors for data centres and offices, and now as the person clients forward quotes to before they sign. The bad ones tend to fail in the same handful of ways. None of these red flags mean a contractor is dishonest. Most of the time they mean the contractor is sloppy about paperwork, and sloppy paperwork has a way of predicting sloppy work.

Here are the five things I look for first.

One unlabelled lump sum

A quote that says "structured cabling: $8,400" and nothing else tells you almost nothing. You cannot tell how many drops you are getting, what the labour portion is, or where the money goes if the scope shrinks. More importantly, you cannot compare it against anyone else's number, because you do not know what the number contains.

A reasonable quote breaks out drop count, cable, terminations, patch panels, and labour. It does not need to be an itemized novel. It needs enough detail that a second contractor could read it and price the same job.

When I see a single lump sum, my first question is always the same: what happens to the price if we add two drops or remove five? If the contractor cannot answer quickly, the number was never built from parts in the first place.

No testing or certification line

Every run should be tested after termination, and the results should be handed to you. For most small jobs that means a pass/fail test report from a proper cable tester; for larger commercial work it means full certification results for every link.

If testing does not appear anywhere on the quote, one of two things is true. Either the contractor tests and did not bother to say so, or the contractor does not test. You want to find out which before you sign, because an untested run that fails six months later becomes your problem, not theirs.

Testing is cheap at install time and expensive to retrofit. It is also the only proof you will ever have that the work was done properly while the walls were still open.

No cable specification

"Cat6" on its own is not a specification. Is it riser-rated or plenum-rated? Solid or stranded? Which manufacturer? Shielded or unshielded? These details decide whether the install passes inspection, whether it supports the speeds you are paying for, and whether the runs will still be serviceable in fifteen years.

The gap between decent bulk cable and the cheapest copper-clad aluminum junk on the market is real, and a quote that just says "Cat6" leaves the contractor free to install either one. Ask for the brand and part number. A contractor who buys good cable will tell you without hesitation, because it is a selling point.

Vague "misc materials"

Some miscellaneous line is normal. Velcro, J-hooks, firestop, wall plates, and labels add up, and nobody wants to itemize every zip tie. What I flag is a miscellaneous line that is large relative to the job, or one that floats with no explanation at all.

On a $5,000 job, a few hundred dollars of sundries is unremarkable. A $1,500 "misc materials and consumables" line on the same job is a place where margin hides. Ask what is in it. The answer matters less than whether the contractor can give one.

No as-built documentation

This is the omission that costs the most and gets noticed the least. When the job is done, you should receive labelled ports at both ends, a patch panel that matches the labels, and a simple document or drawing showing where every run terminates.

Without it, every future technician starts by toning out cables, and you pay for that rediscovery every single time. I have watched businesses pay more over the years in "figure out what the last guy did" hours than the original install cost. Documentation takes the installer an hour or two while everything is fresh. It should be in the quote, by name.

What I do with a quote that fails

Missing one of these five is a conversation. Missing three or four is a pattern, and I would keep looking. The good contractors, and there are plenty of them, tend to pass all five without being asked, because detailed quotes protect them as much as you.

If you have a cabling quote in hand and something about it feels thin, this is exactly the kind of document I review as part of my consulting work. A second opinion on a quote is a small fixed fee against a mistake that gets sealed inside your walls.